Before anyone hits the field — define what needs to be done and flag obvious risks early
Step 2 — Assess Hazards (Tailgate JSA/FLHA)
Gather the crew, review or complete the JSA/FLHA, confirm everyone understands their role
Weather Conditions Select weather conditions Clear Cloudy Rain Heavy Rain Wind Snow Fog Extreme Heat Tailgate / Toolbox Talk held with entire crew
JSA / FLHA — Job Steps, Hazards & Controls PPE Required on Site
Hard Hat
Safety Glasses
Safety Goggles
Face Shield
Steel-Toed Boots
Hi-Vis Vest / Coveralls
Flame-Resistant (FR) Clothing
Chemical-Resistant Gloves
Cut-Resistant Gloves
Leather Work Gloves
H2S Monitor / Personal Gas Detector
Self-Contained Breathing Apparatus (SCBA)
Half-Face Respirator
Full-Face Respirator
Hearing Protection (Earplugs / Earmuffs)
Fall Protection / Harness
Safety Harness & Lanyard
Chemical-Resistant Coveralls
Metatarsal Guards
Safety Toe Rubber Boots
Sunscreen / UV Protection
Insulated / Cold-Weather Gear
First Aid KitAdditional Precautions & Hazards Noted
Step 3 — Review with Crew
Review the JSA/FLHA with the crew, collect sign-offs, and confirm permits are approved and active
JSA / FLHA Sign-Offs Add Sign-OffNo sign-offs added yet. Click "Add Sign-Off" to add crew signatures.
Step 4 — Take Permits & Tools (LOTO)
Pre-use inspections, LOTO verification, and gas testing before execution
Active Permits
Hot Work Permit (welding, grinding)
Confined Space Entry
Lockout/Tagout (LOTO)
Ground Disturbance
Excavation Permit
Electrical Work Permit
Cold Work Permit
Working at Heights
OtherAll required permits approved and active
Pre-use equipment inspections completed
Energy isolation (LOTO) verified
Gas testing completed (H₂S / confined space)
Step 5 — Start & Monitor | Review and Close
Follow the JSA and permit conditions, monitor work, close out the site, and capture lessons learned
Work Execution & Monitoring
Stop Work Authority exercised
Re-JSA required (conditions changed)
Job Close-Out
Worksite cleaned and secured
Permits closed and signed off
All isolations properly removed
Close-Out Notes
Post-Job Review
Lessons Learned Job Close-Out Sign-Off
Sign off to close the job — a report will be automatically emailed to safety@cloverplains.com
Signature *
Draw signature above
Sign Off & Email Report to SafetyReport will be emailed to safety@cloverplains.com automatically